Abstract: The risk assessment of environmental conflicts has been an integral part of measuring the operability of projects as well as the happiness of the affected population. With the current situation of environmental crises, environmental conflict has an effect on society. In order to maintain the stable development of society, we used the fuzzy comprehensive evaluation method and the analytic hierarchy process to study the risk of a population being affected by a project producing environmental pollution. Furthermo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
11
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(11 citation statements)
references
References 27 publications
0
11
0
Order By: Relevance
“…And four judgment matrixes of the second class index can be calculated through the expert evaluation method. The sources of the applied equations were based on the previous literature of FCE (Liao et al, 2018;Pu et al, 2018;Lyu et al, 2019). Bi(i = 1, 2, 3, 4) is the evaluation vector of the factor layer (second class index):…”
Section: Establish the Fuzzy Evaluation Matrixmentioning
confidence: 99%
“…And four judgment matrixes of the second class index can be calculated through the expert evaluation method. The sources of the applied equations were based on the previous literature of FCE (Liao et al, 2018;Pu et al, 2018;Lyu et al, 2019). Bi(i = 1, 2, 3, 4) is the evaluation vector of the factor layer (second class index):…”
Section: Establish the Fuzzy Evaluation Matrixmentioning
confidence: 99%
“…Achieving substantive public participation requires government guidance and regulation. Therefore, the scientific arrangement of the participants, topic for discussion, procedures and scope is the necessary link to ensure the substantive participation of the public and public participation is not only essential at the site selection stage, but also should contribute to the construction, operation and abandonment stage to help decision-makers establish the most apposite solutions satisfying the broad interests of society [32].…”
Section: Public Participationmentioning
confidence: 99%
“…While in relation to quantitative research, scholars were keen on positivist methodologies that utilized structured interviews [30], questionnaires [31] and other methods to collect data, and then trended with a statistical analysis. Meanwhile, some scholars proposed a combination of qualitative and quantitative methods for the assessment of environmental conflict risk, as evidenced by the study of Liao et al [32], who put forward a combined method (analytic hierarchy process and fuzzy comprehensive evaluation) and well-presented evaluation results, as a reinforcement of the conventional qualitative and quantitative methods. Surprisingly, rarely considered is the combination of qualitative and quantitative methods as a NIMBY crisis research method.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Integrating biodiversity protection into sectoral policy agendas, defined portfolio of actions and communicating the complex issue of biodiversity to different stakeholders, generally needs more attention 16 . Also, the general public could be more involved in the environmental activities, providing better information on environmental assessment items 17 .…”