Ensuring the Safety of Construction Works During the Erection of Buildings and Structures

Abstract: При возведении зданий и сооружений промышленного и гражданского назначения важным является обеспечение безопасных условий труда оператору башенного крана и исполнителям строительно-монтажных работ на строительной площадке, поскольку эти условия во многом определяют производительность башенного крана и темпы строительства в целом.Аварии, связанные с использованием грузоподъемной техники в строительстве, зачастую приводят не только к травматизму и гибели участников самого строительного производства, но и сторонн… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
3
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 11 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…Demolding the samples was carried out after 2 days. Samples with modified technical sulphur were subjected to additional volumetric thermocatalytic treatment at 180 • C for 60 min, and then gradually cooled to room temperature for 2 h [4,5,42]. All samples were stored in wet conditions for 28 days and then, after 28 days, the samples were loaded into the aggressive hydrosulphate medium.…”
Section: Sample Preparationmentioning
confidence: 99%
See 1 more Smart Citation
“…Demolding the samples was carried out after 2 days. Samples with modified technical sulphur were subjected to additional volumetric thermocatalytic treatment at 180 • C for 60 min, and then gradually cooled to room temperature for 2 h [4,5,42]. All samples were stored in wet conditions for 28 days and then, after 28 days, the samples were loaded into the aggressive hydrosulphate medium.…”
Section: Sample Preparationmentioning
confidence: 99%
“…2021, 11, 8509 2 of 13 protect against aggressive influences. Waterproofing via surface penetration of the compositions or bulk thermocatalytic impregnations can be distinguished as the main methods of waterproofing building capillary-porous materials [4][5][6].…”
Section: Introductionmentioning
confidence: 99%
“…There is also a large number of works related to the development of digital models [26,41], taking into account the analysis of the electric drive system, which makes it possible to form the basis for the development of integrated methods of the monitoring and evaluation of energy efficiency. This approach allows for the use of digital models for the detection of pre-emergency situations by determining the stress-strain state [42] of individual mill units.…”
mentioning
confidence: 99%