2014
DOI: 10.1016/j.enggeo.2014.08.022
|View full text |Cite
|
Sign up to set email alerts
|

Engineering geological and geotechnical investigations along the head race tunnel in Teesta Stage-III hydroelectric project, India

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
10
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 25 publications
(10 citation statements)
references
References 25 publications
0
10
0
Order By: Relevance
“…The three-dimensional wedges are formed by the intersections of three or more joint planes on the excavation boundary of the opening [76,77]. There are three discontinuity sets in the 1-1# stope roof.…”
Section: Unwedge Simulationmentioning
confidence: 99%
“…The three-dimensional wedges are formed by the intersections of three or more joint planes on the excavation boundary of the opening [76,77]. There are three discontinuity sets in the 1-1# stope roof.…”
Section: Unwedge Simulationmentioning
confidence: 99%
“…Different Support Categories (type of support) for different rock mass classes are defined by these values. Similarly, the classification systems have become a tool for evaluating the geotechnical parameters of different rock masses from various empirical equations (Ozsan et al, 2009;Ghiasi et al, 2011;Panda et al, 2014).…”
Section: Introductionmentioning
confidence: 99%
“…With the advancement of underground engineering technology, more and more tunnels have been built in deep complex rock strata [1][2][3]. In the process of deep tunneling, alternating soft and hard composite rock strata are often encountered.…”
Section: Introductionmentioning
confidence: 99%