2022
DOI: 10.1016/j.jii.2021.100293
|View full text |Cite
|
Sign up to set email alerts
|

Energy-efficient scheduling of flexible job shops with complex processes: A case study for the aerospace industry complex components in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
7
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 24 publications
(11 citation statements)
references
References 46 publications
0
7
0
Order By: Relevance
“…Each comparative algorithm was independently run 30 times on the test set to obtain the average IGD a and ξ . Tables (4) and (5) show the average values of x and y for the 10 groups obtained by the three algorithms. The best performing metric is indicated in bold and italic.…”
Section: Comparison and Discussionmentioning
confidence: 99%
See 2 more Smart Citations
“…Each comparative algorithm was independently run 30 times on the test set to obtain the average IGD a and ξ . Tables (4) and (5) show the average values of x and y for the 10 groups obtained by the three algorithms. The best performing metric is indicated in bold and italic.…”
Section: Comparison and Discussionmentioning
confidence: 99%
“…The results in Table (5) show that IMOEA/D algorithm obtained the best performance in 8 instances, while EATS algorithm obtained the best performance in one test case, and IH-PSO algorithm obtained the best performance in one instance as well. Compared with the EATS algorithm, IMOEA/D algorithm significantly outperformed it in 4 instances (M1, M3, M6, and M9) and showed no significant difference in the other 6 instances.…”
Section: Comparison and Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…Based on a comprehensive analysis of the amount of equipment in each manufacturing cell, product types and batches, and product process routes and considering the area of the manufacturing cell, safety Computational Intelligence and Neuroscience distance between equipment, and workers' operation space, the optimized cell layout of the production plant of an aerospace enterprise is drawn based on SLP, as shown in Figure 16. We note that the related information of processing time is available in our previous work [35].…”
Section: Dynamic Layout Solutionmentioning
confidence: 99%
“…Zheng [20] and others studied the job-shop scheduling problem with dual resource constraints, established a model with the goal of minimizing the completion time, combined a knowledge-guided search with a smell-based search, and proposed a new encoding scheme, a knowledge-guided Drosophila optimization algorithm, to solve it. Jiang et al [21] addressed an energy-efficient scheduling problem of flexible job-shops with complex processes, and they proposed a novel improved-crossover artificial bee colony algorithm. Wang et al [22] firstly performed an improved genetic algorithm to solve the energy consumption scheduling problem of a remanufacturing system with disassembly, reprocessing and reassembly, and then they provided a new idea for the integrated optimization of a remanufacturing system.…”
Section: Introductionmentioning
confidence: 99%