2015
DOI: 10.1016/j.rser.2014.11.069
|View full text |Cite
|
Sign up to set email alerts
|

Encouraging the environmentally sound management of C&D waste in China: An integrative review and research agenda

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

2
30
0
1

Year Published

2017
2017
2024
2024

Publication Types

Select...
6
4

Relationship

0
10

Authors

Journals

citations
Cited by 138 publications
(45 citation statements)
references
References 29 publications
2
30
0
1
Order By: Relevance
“…This discrepancy between outflow and inflow indicates that closing the loop for construction materials based on the urban mine alone seems highly unrealistic before the year 2050. Especially given the fact that only a fraction of the secondary materials could actually be re-used (Nautiyal et al, 2015;Duan et al, 2015;Martínez-Rocamora et al, 2016).…”
Section: Materials Calculations (Inflow-outflow)mentioning
confidence: 99%
“…This discrepancy between outflow and inflow indicates that closing the loop for construction materials based on the urban mine alone seems highly unrealistic before the year 2050. Especially given the fact that only a fraction of the secondary materials could actually be re-used (Nautiyal et al, 2015;Duan et al, 2015;Martínez-Rocamora et al, 2016).…”
Section: Materials Calculations (Inflow-outflow)mentioning
confidence: 99%
“…The table also highlights the importance of sorting during collection to deliver quality products: the frequency of production of recycled materials (aggregate for concrete, sand, gravel, natural opengraded aggregate) for applications subject to strict requirements was highest with clean C&DW, followed by mixed and dirty waste, in that order. The rate of production of higher quality recycled materials could be raised by improving the technology presently in place in management facilities (Duan et al, 2015), with the introduction of near-infrared sorting for mixed waste, for instance (Vegas et al, 2015).…”
Section: Products Manufactured From Canddwmentioning
confidence: 99%
“…According to report, Beijing's C&D waste discharge amount in 2015 has reached 29.6 million tons, generating about 81,200 tons on average a day. Large quantities of continuously produced C&D waste have become a social issue, which pollutes the environment and bothers Beijing citizens as well [1][2][3][4].…”
Section: Introductionmentioning
confidence: 99%