The platform will undergo maintenance on Sep 14 at about 7:45 AM EST and will be unavailable for approximately 2 hours.
2019 IEEE Power &Amp; Energy Society General Meeting (PESGM) 2019
DOI: 10.1109/pesgm40551.2019.8973919
|View full text |Cite
|
Sign up to set email alerts
|

Enabling the Existing Point-to-Point VSC-HVDC Control for Multi-Terminal Operation

Abstract: Existing point-to-point (PtP) VSC-HVDC link's control is usually not prepared for a multi-terminal HVDC (MTDC) operation, e.g. the DC voltage droop control might not exist in the PtP link or active power control might not exist in the offshore wind farm (OWF) link. Therefore, an existing PtP link's converter control needs to be adjusted when this link is expanded into an MTDC system by interconnecting new converters into the existing system. If only one vendor is involved in the MTDC system, these MTDC specifi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 6 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?