2017
DOI: 10.1515/cait-2017-0012
|View full text |Cite
|
Sign up to set email alerts
|

Empirical Study of Job Scheduling Algorithms in Hadoop MapReduce

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
4
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(4 citation statements)
references
References 25 publications
0
4
0
Order By: Relevance
“…It can be seen from formula (6) that there is a large deviation between the value of the measured impedance c Z and b Z at this time, and the error of the measured impedance c Z is large. As shown in formula (7), the P value deviates significantly from zero. Whether the measurement circuit is defective can be confirmed by the size of the P value.…”
Section: Fault Diagnosis Modelmentioning
confidence: 94%
See 1 more Smart Citation
“…It can be seen from formula (6) that there is a large deviation between the value of the measured impedance c Z and b Z at this time, and the error of the measured impedance c Z is large. As shown in formula (7), the P value deviates significantly from zero. Whether the measurement circuit is defective can be confirmed by the size of the P value.…”
Section: Fault Diagnosis Modelmentioning
confidence: 94%
“…Patel et al [6] according to the historical state and real-time state of the equipment, the state quantity is divided into static data and dynamic data, and the state estimation method based on the weight of the equipment is studied. Jyoti et al [7] treats the evaluation index as fuzzy, and the fuzzy comprehensive evaluation method of relay protection is proposed. Moses et al [8] equipment condition monitoring and secondary loop condition monitoring were analyzed, and a secondary equipment condition detection model was established.…”
Section: Introductionmentioning
confidence: 99%
“…However, the scheduler does not consider the user and job heterogeneity. In addition to that, because capacity scheduler uses the concept of queue capacity, queues may have less capacity to take more time to process the job [16].…”
Section: B Hadoop Schedulermentioning
confidence: 99%
“…One criterion could be the minimization of makespan -Cmax for example, where Cmax corresponds to the maximal time necessary for completion all jobs. This is chronologically the earliest developed model and the most often usedsee for example [10,21,18]. This model corresponds to real life production situations [37], where the machines could perform more than one operation (not at the same time) with corresponding different production times, i.e., some or all of the machines are multifunctional.…”
Section: Formulation Of Job Shop Scheduling Problem (Jssp)mentioning
confidence: 99%