Electricity Demand and Supply Planning Analysis for Sumatera Interconnection System using Integrated Resources Planning Approach

Abstract: The Sumatra interconnection system, which is the second-largest electricity system in Indonesia, is often experiencing rolling blackouts. That caused by a lack of supply from the power generating system of Sumatra. The Government has planned to develop new power plants through the fast track program (FTP). Until 2015, either power outages and supply shortages are still common. Therefore, an analysis of long-term electricity planning needed to support energy security in Sumatra. The Sumatra electricity system w… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
0
0
3

Year Published

2022
2022
2023
2023

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 21 publications
(26 reference statements)
0
0
0
3
Order By: Relevance
“…Kapasitas pembangkit listrik dapat dihitung secara endogenous untuk mempertahankan nilai planning reserve margin (PRM) yang telah ditentukan. Perhitungan kapasitas pembangkit diawali dengan menghitung nilai kapasitas yang ada dengan persamaan 1 (Suhono, Sarjiya, and Hadi 2019). PRM sebelum ada penambahan kapasitas secara endogenous dihitung berdasarkan persamaan 3 (Suhono, Sarjiya, and Hadi 2019).…”
Section: Analisis Penyediaan Energiunclassified
See 2 more Smart Citations
“…Kapasitas pembangkit listrik dapat dihitung secara endogenous untuk mempertahankan nilai planning reserve margin (PRM) yang telah ditentukan. Perhitungan kapasitas pembangkit diawali dengan menghitung nilai kapasitas yang ada dengan persamaan 1 (Suhono, Sarjiya, and Hadi 2019). PRM sebelum ada penambahan kapasitas secara endogenous dihitung berdasarkan persamaan 3 (Suhono, Sarjiya, and Hadi 2019).…”
Section: Analisis Penyediaan Energiunclassified
“…Perhitungan kapasitas pembangkit diawali dengan menghitung nilai kapasitas yang ada dengan persamaan 1 (Suhono, Sarjiya, and Hadi 2019). PRM sebelum ada penambahan kapasitas secara endogenous dihitung berdasarkan persamaan 3 (Suhono, Sarjiya, and Hadi 2019). (5)…”
Section: Analisis Penyediaan Energiunclassified