Effect of project complexity on cost and schedule performance in transportation projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
34
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
9
1

Relationship

1
9

Authors

Journals

citations
Cited by 48 publications
(44 citation statements)
references
References 71 publications
0
34
0
Order By: Relevance
“…Inferential statistics-including bivariate Pearson correlation analysis and hierarchical multiple regression analysis-are used to test the research hypotheses. These analysis methods were selected because they were widely used to investigate the relationships of independent and moderator variables with a dependent variable in many previous studies (e.g., Chih et al, 2016;Chih et al, 2017;Nguyen et al, 2019), which is similar in nature to this study's research objectives. In addition to this reason, the sample size of the collected data (i.e., 79 valid responses) was also considered to be more appropriate with these analysis methods than structural equation modelling, which usually requires a larger sample size (i.e., at least 100 for results to be reasonably reliable and above 200 to avoid the risk of sample non-normality; Bagozzi and Yi, 2012).…”
Section: Discussionmentioning
confidence: 99%
“…Inferential statistics-including bivariate Pearson correlation analysis and hierarchical multiple regression analysis-are used to test the research hypotheses. These analysis methods were selected because they were widely used to investigate the relationships of independent and moderator variables with a dependent variable in many previous studies (e.g., Chih et al, 2016;Chih et al, 2017;Nguyen et al, 2019), which is similar in nature to this study's research objectives. In addition to this reason, the sample size of the collected data (i.e., 79 valid responses) was also considered to be more appropriate with these analysis methods than structural equation modelling, which usually requires a larger sample size (i.e., at least 100 for results to be reasonably reliable and above 200 to avoid the risk of sample non-normality; Bagozzi and Yi, 2012).…”
Section: Discussionmentioning
confidence: 99%
“…Previous data in organizational data-bases were considered as potential sources of information, and a neural network model was used to estimate cost of new product based on the past data. Nguyen et al [22] demonstrated the impact of project complexity on resource allocation and project scheduling. In both cases it was concluded that project complexity has a direct relation with risks of failure.…”
Section: B Project Complexitymentioning
confidence: 99%
“…That is to say, contractors working in number of projects with their full workload capacity, and resources fully in use, premium payment needed for any extra work (Fayek, 1998). Otherwise, contractors suffer resources shortage that leads to decreasing effect on schedules owing to this complication (Nguyen et al, 2018)(Liu et al, 2018. This study is not only beneficial for the client decision making but also to the dynamic relationship between the parties in road works projects (Emre and Hastak, 2009).…”
mentioning
confidence: 91%