Proceedings of the 3rd International Conference on Application and Theory of Automation in Command and Control Systems 2013
DOI: 10.1145/2494493.2494500
|View full text |Cite
|
Sign up to set email alerts
|

Effect of flight plans predictability and accuracy on traffic demand forecast

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2015
2015
2021
2021

Publication Types

Select...
2
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(7 citation statements)
references
References 5 publications
0
7
0
Order By: Relevance
“…Flights arriving at the FIR tend to be later than indicated in the initial flight plan. Flights arriving at Barcelona FIR are less delayed than flights arriving at the bigger Spanish Peninsular FIR [9]. …”
Section: Sector Traffic Typementioning
confidence: 95%
See 2 more Smart Citations
“…Flights arriving at the FIR tend to be later than indicated in the initial flight plan. Flights arriving at Barcelona FIR are less delayed than flights arriving at the bigger Spanish Peninsular FIR [9]. …”
Section: Sector Traffic Typementioning
confidence: 95%
“…[11] does not rank uncertainty sources but investigates prediction performance by weather type, flight plan submission, regulation and flight type. Reference Sample time Sample airspace Analyzed prediction performance metrics [12] 286 days 754 U.S. sectors peak count [9] 30 days Spanish FIR sector entry time [10] 5 days 2 U.S. ACC's sector occupancy count, sector entry time [11] 4 days 2 U.S. ACC's sector entry time, hit rate Table 2.1 shows sample time, sample airspace, and studied prediction performance metrics used in the articles that are discussed in this section. Take note that prediction error for the reviewed papers is calculated by the "actual time" minus "predicted time".…”
Section: Individual Flight Examplementioning
confidence: 99%
See 1 more Smart Citation
“…Reference Sample time Sample airspace Analyzed prediction performance metrics [12] 286 days 754 U.S. sectors peak count [9] 30 days Spanish FIR sector entry time [10] 5 days 2 U.S. ACC's sector occupancy count, sector entry time [11] 4 days 2 U.S. ACC's sector entry time, hit rate Table 2.1 shows sample time, sample airspace, and studied prediction performance metrics used in the articles that are discussed in this section. Take note that prediction error for the reviewed papers is calculated by the "actual time" minus "predicted time".…”
Section: Factors Affecting Sector Demand Predictabilitymentioning
confidence: 99%
“…Take note that prediction error for the reviewed papers is calculated by the "actual time" minus "predicted time". and ATC actions style and preferences [10] of controllers Horizontal route prediction accuracy Vertical route prediction accuracy Flight speed prediction accuracy Changing airspace adaption data Weather and wind forecast accuracy Accuracy of surveillance data Flight technical and operational errors Accuracy of trajectory models Factors affecting Airspace Sector altitude class, sector demand primary traffic type predictions (departures, arrivals, [12] en route, mixed), ACC [11] Flight type Commercial, GA or military flights Factor affecting FIR Traffic type Departing or arriving demand prediction [9] 2.…”
Section: Factors Affecting Sector Demand Predictabilitymentioning
confidence: 99%