Abstract. The global floating offshore wind energy industry is rapidly maturing, with several technologies having been installed at pilot and demonstration scales. As the industry progresses to full array-scale deployments, the optimization of marine activities related to installation, operation and maintenance, and decommissioning presents a significant opportunity for cost reduction. This paper reviews the various marine operations challenges towards the commercialization of floating wind in the context of spar-type, semi-submersible and tension leg platform (TLP) technologies. Knowledge gaps and research trends are identified along with a review of innovations at various stages of development, which are intended to widen weather windows, reduce installation costs, and improve the health and safety of floating-wind-related marine operations.