Technical Definition of the TetraSpar Demonstrator Floating Wind Turbine Foundation

Abstract: With the deployment of the TetraSpar demonstrator, a significant cost-reduction is realized in the field of offshore floating wind turbines. The TetraSpar floating wind turbine foundation brings a milestone that emphasizes on a modular and fully industrialized foundation that consists of main components already widely available in the current wind energy supply chain. In an effort to provide an open approach to the development of the concept, this paper aims at giving a description of the design in order to en… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
28
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 44 publications
(34 citation statements)
references
References 1 publication
(1 reference statement)
0
28
0
Order By: Relevance
“…A prototype of the TetraSpar floater design aims to reduce production and installation costs of floating offshore wind turbines by utilising simple tubular elements and by use of the counterweight. This counterweight can be lowered once the turbine has been towed to the deployment site, thus eliminating the need for deep-water harbours and/or the use of expensive offshore operations vessels (see Borg et al (2020) for details of the full-scale deployment, with the floater installed in July 2021). The wave basin is 30m wide and 20m long, with an absorbing beach and an articulated flap wavemaker hinged 1.5 m above the basin floor (see figure 1).…”
Section: Basin Experimentsmentioning
confidence: 99%
“…A prototype of the TetraSpar floater design aims to reduce production and installation costs of floating offshore wind turbines by utilising simple tubular elements and by use of the counterweight. This counterweight can be lowered once the turbine has been towed to the deployment site, thus eliminating the need for deep-water harbours and/or the use of expensive offshore operations vessels (see Borg et al (2020) for details of the full-scale deployment, with the floater installed in July 2021). The wave basin is 30m wide and 20m long, with an absorbing beach and an articulated flap wavemaker hinged 1.5 m above the basin floor (see figure 1).…”
Section: Basin Experimentsmentioning
confidence: 99%
“…Section 3 presents, compares and discusses the results and is followed by the concluding remarks. A more detailed description of the TetraSpar and its structure can be found in [10].…”
Section: Keelmentioning
confidence: 99%
“…In order for the FOWT technology to reach a fully commercial and economically feasible stage, it is a strategical approach to ensure a design which is ready for a scalable and industrialized production, which minimizes required work at the port of embarkation and which eliminates the need for specialized vessels [10].…”
Section: Introductionmentioning
confidence: 99%
See 2 more Smart Citations