2020
DOI: 10.1051/e3sconf/202015704035
|View full text |Cite
|
Sign up to set email alerts
|

Economic assessment of construction of the roadside service facilities

Abstract: There is a strategy of the E-95 road «Pskov» infrastructure improvement and some practical recommendations for implementation of the plan in this work. The main purpose of the article is infrastructure improvement of the section of the Federal highway, for example, some new workplaces can be created, moreover, comfort and safety increasing can improve people’s quality of life. Such objects as petrol-filling stations and service stations are essential elements for the modernization of the roadside infrastructur… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
5
2

Relationship

1
6

Authors

Journals

citations
Cited by 8 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…The temperature of exhaust gases along the length of the exhaust line is 800-830° centigrade, the surface temperature along the length of the exhaust line is lower and can reach 710-770° centigrade. According to the reference data [14][15], when the initial burning occurs in the engine compartment of a parked motor car, the flame spreads to the interior of the car in 8-10 minutes In another 1-2 minutes the interior takes fire totally. Hereafter, the car is on fire.…”
Section: Discussionmentioning
confidence: 99%
“…The temperature of exhaust gases along the length of the exhaust line is 800-830° centigrade, the surface temperature along the length of the exhaust line is lower and can reach 710-770° centigrade. According to the reference data [14][15], when the initial burning occurs in the engine compartment of a parked motor car, the flame spreads to the interior of the car in 8-10 minutes In another 1-2 minutes the interior takes fire totally. Hereafter, the car is on fire.…”
Section: Discussionmentioning
confidence: 99%
“…The rutting resistance, resilience modulus, and toughness of asphaltic can be increased via the wet process and crumb rubber modifications. The major reason for the improved properties is the interchanges in the viscosity, softening point, and the swelling process of rubber that binds with bitumen [14][15][16]. The literature shows that this swelling is 3-5% to its original size due to extensive absorption of bitumen components [17,18].…”
Section: Introductionmentioning
confidence: 99%