2013
DOI: 10.1061/(asce)wr.1943-5452.0000285
|View full text |Cite
|
Sign up to set email alerts
|

Dynamic Planning of Water Resource and Electric Power Systems under Uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2014
2014
2017
2017

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 16 publications
0
1
0
Order By: Relevance
“…Nevertheless, the head drop in any PRS is a dissipation of energy which should be converted to electric energy (Carravetta et al 2013b;Filion et al 2004;Sammartano et al 2013). Hydropower is considered a proven reliable energy resource (Lin et al 2013;Fathi-Moghadam et al 2013) and is proposed herein to recover energy within WDNs. A technical solution, combining both economic benefits and system flexibility for smaller implementations, is the installation of pumps used as turbines (PATs) (Zakkour et al 2002) within the PRSs.…”
Section: Introductionmentioning
confidence: 99%
“…Nevertheless, the head drop in any PRS is a dissipation of energy which should be converted to electric energy (Carravetta et al 2013b;Filion et al 2004;Sammartano et al 2013). Hydropower is considered a proven reliable energy resource (Lin et al 2013;Fathi-Moghadam et al 2013) and is proposed herein to recover energy within WDNs. A technical solution, combining both economic benefits and system flexibility for smaller implementations, is the installation of pumps used as turbines (PATs) (Zakkour et al 2002) within the PRSs.…”
Section: Introductionmentioning
confidence: 99%