Dynamic Load Balancing Among Multiple Fabrication Lines Through Estimation of Minimum Inter-Operation Time

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
8
0

Year Published

2006
2006
2013
2013

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 25 publications
(8 citation statements)
references
References 9 publications
0
8
0
Order By: Relevance
“…The other track focused on the capacity-trading decisions between the two plants. Example studies on the route assignment decisions include Toba et al (2005) and Wu et al (2009aWu et al ( , 2009b. Example studies on the capacity-trading decisions include Wu and Chang (2007), Chen et al (2008), Chiang et al (2010) and Renna and Argoneto (2011).…”
Section: Relevant Literaturementioning
confidence: 99%
See 1 more Smart Citation
“…The other track focused on the capacity-trading decisions between the two plants. Example studies on the route assignment decisions include Toba et al (2005) and Wu et al (2009aWu et al ( , 2009b. Example studies on the capacity-trading decisions include Wu and Chang (2007), Chen et al (2008), Chiang et al (2010) and Renna and Argoneto (2011).…”
Section: Relevant Literaturementioning
confidence: 99%
“…In contrast, Toba et al (2005) addressed the route assignment problem in shop floor control context; that is, how to determine the production route of a job in a real time manner by dynamically considering machine breakdown status.…”
Section: Relevant Literaturementioning
confidence: 99%
“…Only a few studies on the route planning problem have been published. Toba et al (2005) addressed the route planning problem in a real-time manner. That is, whenever an operation of a job is completed, a decision -which fab to use to manufacture the next operation -must be made immediately.…”
Section: Introductionmentioning
confidence: 99%
“…Prior studies on such a route planning problem are relatively few. With each job route being cut into several segments, Toba, Izumi, Hatada, and Chikushima (2005) studied the route planning problem in a real-time manner. That is, whenever a segment is completed, a decision-which fab to manufacture the next segment-must be immediately made.…”
Section: Introductionmentioning
confidence: 99%