All Days 2016
DOI: 10.2118/180400-ms
|View full text |Cite
|
Sign up to set email alerts
|

Drilling Engineering and Formation Evaluation: An Integrated Approach to Improve Real Time Drilling Optimization

Abstract: In the current market climate, the industry is in a time squeeze and it is crucial for future value generation to reduce the well construction time and cost. Drilling Optimization practices have helped to increase drilling efficiency while reducing the likelihood of downhole failures. To see this effort further, an adequate engineering plan to design the operation strategy, along with the understanding of the geological challenges, assists in establishing a more robust real-time optimization program. … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 3 publications
0
3
0
Order By: Relevance
“…The drilling efficiency is directly proportional to the total non-productive time (NPT) [46]. Usually, the NPT represents one-third of the total rig operational expenditure [47]. A statistical analysis in the Gulf of Mexico showed that in 10 years, more than 12% of the NPT was due to a loss of circulation and about 18% was a result of kicks and wellbore instabilities [48].…”
Section: Theory Of Pre-operational Testingmentioning
confidence: 99%
“…The drilling efficiency is directly proportional to the total non-productive time (NPT) [46]. Usually, the NPT represents one-third of the total rig operational expenditure [47]. A statistical analysis in the Gulf of Mexico showed that in 10 years, more than 12% of the NPT was due to a loss of circulation and about 18% was a result of kicks and wellbore instabilities [48].…”
Section: Theory Of Pre-operational Testingmentioning
confidence: 99%
“…[16] A thorough autopsy of the case was performed using a private third-party approach. Based on an advanced drilling engineering method, to determine the root causes of the incident [17] Pre-job engineering, also inside the hole Invisible when out and about Rig's overall by eliminating time and ways to improve performance considers [18] As data volume increases, remote engineers Their analysis has a huge impact Focus on tools that can also drive efficiency to be paid. Real-time hydraulics and torque and tools such as drag (T&D) analysis and by using engineering models, Engineers work on the position of a well can be determined before half.…”
Section: Drilling Engineeringmentioning
confidence: 99%
“…Different Suitable grinding in grinding processes six including selection of process parameters Decision problems are considered. [18] Proposed a A two-stage approach: First Supplier evaluation at stage used implicitly. MULTIMOORA with triangular fuzzy numbers.…”
Section: Mooramentioning
confidence: 99%