2013
DOI: 10.2172/1114571
|View full text |Cite
|
Sign up to set email alerts
|

Draft Function Allocation Framework and Preliminary Technical Basis for Advanced SMR Concepts of Operations

Abstract: EXECUTIVE SUMMARYThis report presents preliminary research results from the investigation into the development of new models and guidance for Concepts of Operations in advanced small modular reactor (aSMR) designs. aSMRs are nuclear power plants (NPPs), but unlike conventional large NPPs that are constructed on site, aSMRs systems and components will be fabricated in a factory and then assembled on site. aSMRs will also use advanced digital instrumentation and control systems, and make greater use of automatio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2013
2013
2015
2015

Publication Types

Select...
2

Relationship

2
0

Authors

Journals

citations
Cited by 2 publications
(8 citation statements)
references
References 13 publications
0
8
0
Order By: Relevance
“…As explained in t he September 2012 and April 2013 milestone report s [22], [23], WDA has never been applied in the development or analysis of concepts of operation in the nuclear industry. T his does not mean that AdvSMR designers should try to innovate just for the sake of innovation; rather it means that we should recognize that new technology often requires not just new design techniques, but also new mental models.…”
Section: Methodology Reviewmentioning
confidence: 99%
See 4 more Smart Citations
“…As explained in t he September 2012 and April 2013 milestone report s [22], [23], WDA has never been applied in the development or analysis of concepts of operation in the nuclear industry. T his does not mean that AdvSMR designers should try to innovate just for the sake of innovation; rather it means that we should recognize that new technology often requires not just new design techniques, but also new mental models.…”
Section: Methodology Reviewmentioning
confidence: 99%
“…As explained in previous reports (cf. [23]), the Function Allocation process forms one of the elements conducted by NPP designers as part of the Human Factors Engineering Program in conformance with the requirements of NUREG-0711 (Human Factors Engineering Program Review Model). It should be emphasized that FA is not a stand-alone process and would always be performed in association with either a power plant upgrade effort (for example control room upgrade) or as part of systems engineering for a new plant.…”
Section: Project Objectives and Scopementioning
confidence: 99%
See 3 more Smart Citations