2022
DOI: 10.1007/s11334-021-00426-2
|View full text |Cite
|
Sign up to set email alerts
|

Domain engineering for customer experience management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2
1
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 28 publications
0
1
0
Order By: Relevance
“…When it comes to MCDM procedures, no guidelines exist for deciding the number of respondents. As TOPSIS is not based on statistics, a modest sample size was adequate [44,45,46]. In the opinion of Dyadyura [47], MCDM such as TOPSIS and AHP (Analytic Hierarchical Process) are scientifically applicable and do not require a large sample size.…”
Section: Data Collectionmentioning
confidence: 99%
“…When it comes to MCDM procedures, no guidelines exist for deciding the number of respondents. As TOPSIS is not based on statistics, a modest sample size was adequate [44,45,46]. In the opinion of Dyadyura [47], MCDM such as TOPSIS and AHP (Analytic Hierarchical Process) are scientifically applicable and do not require a large sample size.…”
Section: Data Collectionmentioning
confidence: 99%