2013
DOI: 10.1016/j.ijepes.2013.03.041
|View full text |Cite
|
Sign up to set email alerts
|

Distribution network expansion considering distributed generation and storage units using modified PSO algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

1
70
0
1

Year Published

2014
2014
2021
2021

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 117 publications
(73 citation statements)
references
References 23 publications
1
70
0
1
Order By: Relevance
“…Locations and sizes of new substations [26,29,30,32,36,38,54,55,58,66,80,85,89] Sizes of existing substations for reinforcement [24,26,27,29,32,34,36,38 …”
Section: Traditional Variablesmentioning
confidence: 99%
See 1 more Smart Citation
“…Locations and sizes of new substations [26,29,30,32,36,38,54,55,58,66,80,85,89] Sizes of existing substations for reinforcement [24,26,27,29,32,34,36,38 …”
Section: Traditional Variablesmentioning
confidence: 99%
“…The planning model proposed in [66] is the only one involving seven decision variables to satisfy load growth, including optimal reinforcement of existing feeders and substations, or installation new ones, locations of reserve feeders, and optimal locations and sizes of DDGs and RDGs. In [32], the optimal allocations of ESSs and DDGs are integrated into distribution network expansion planning model and serve as the decision variables together with the planning of existing feeders, substations and new ones. In the process of planning, the roles of ESSs are taken into consideration including peak load shaving and reliability improvement.…”
Section: Planning Objectivesmentioning
confidence: 99%
“…However, the actual maximum solar irradiance will be achieved below 800 W/m 2 since PV module temperature and ambient temperature under Malaysia climate condition will contribute to the deterioration of measured value [31]. In order to avoid large variations in solar electricity production, it is necessary to include energy storage and releasing it in peak consumption periods for bringing very short fluctuations and for maintaining the continuity of power supply [32]. In Malaysia, apart from the back-up power supply, energy storage is an entirely new concept for peak load shaving in the commercial and industrial sector.…”
Section: Grid-tied Solar Pv Systemmentioning
confidence: 99%
“…Therefore, the influence of different configurations of the installed size and sites on system reliability must be analyzed. Most studies on the allocation of energy storage are mainly focused on two aspects: (1) the sizing configuration of energy storage [2][3][4][5][6][7] and (2) the siting allocation of the energy storage [8][9][10][11][12][13]. For the studies on the capacity configuration of energy storage, the optimization configuration of the installed…”
Section: Introductionmentioning
confidence: 99%