2020
DOI: 10.3390/en13061430
|View full text |Cite
|
Sign up to set email alerts
|

Distortion Load Identification Based on the Application of Compensating Devices

Abstract: The article provides an analysis of the existing methods of identifying the consumer's contribution to voltage distortion at a point of common coupling. The considered methods do not allow correctly and fairly determining the source of harmonic distortions, or they have limited application and difficulties in implementation. The paper proposes new methods for determining the source of high harmonics. The developed methods and techniques are based on the analysis of the grid operation modes with two connected c… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
12
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
7
3

Relationship

1
9

Authors

Journals

citations
Cited by 22 publications
(15 citation statements)
references
References 27 publications
0
12
0
Order By: Relevance
“…The diode rectifier (DR), despite its drawbacks, is still the most common rectifier used in VFD due to its low-cost. DR supplies DC-link in a noncontrollable way and consumes non-sinusoidal currents from the grid, introducing harmonics of 5, 7, 11, 13, … orders [48,49]. Therefore, DR acts as a nonlinear load for the grid.…”
Section: Methodsmentioning
confidence: 99%
“…The diode rectifier (DR), despite its drawbacks, is still the most common rectifier used in VFD due to its low-cost. DR supplies DC-link in a noncontrollable way and consumes non-sinusoidal currents from the grid, introducing harmonics of 5, 7, 11, 13, … orders [48,49]. Therefore, DR acts as a nonlinear load for the grid.…”
Section: Methodsmentioning
confidence: 99%
“…The operation of networks with a voltage of 10 kV of outgoing lines from DSS-10 showed that in the section of the outgoing line at the AHC, when short-circuit currents of 10-12 kA flow, the cable insert at the beginning of the specified line fails very often. This leads to the blackout of a large number of consumers, including the village of Kazreti, which is powered by this line [1,5,11]. The reason is the large value of the flowing short-circuit current and the long time of the relay protection acting on the current interruption [6,10,15].…”
Section: аmentioning
confidence: 99%
“…The simulation showed that the developed structure operated efficiently during start-up, operation, loading and unloading of the GMEU and SMEU (Figure 8). Then a power electronics unit, consisting of the rectifier, inverter, active rectifier and higher harmonics filters was modeled [20][21][22]. The simulation showed that the developed structure operated efficiently during start-up, operation, loading and unloading of the GMEU and SMEU (Figure 8).…”
Section: Efficient Functioning Of Developed Binary Energy Systemmentioning
confidence: 99%