Discussion on Highway Tunnel Monthitoring Measurement Control Standards

Abstract: Tunnel monthitoring reference value is an important indicator to determine the stability of surrounding rock. Existing tunnel specification vault settlement and surrounding convergence gives some guidance views, But in the actual project also found a number of problems, And no indication of surface displacement control reference value specification in. Based on the analysis of relevant norms, In practical engineering, for example, Monthitoring and Measurement standards for construction tunnel some meaningful d… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…In addition, the safety control index database system adapted to different geotechnical, hydrogeological, and environmental conditions in different cities and different construction methods has become a top priority. erefore, the research on the safety control index of underground engineering monitoring will be the key research direction [24].…”
Section: Layout Of Monitoring Points and Safety Control Standardsmentioning
confidence: 99%
“…In addition, the safety control index database system adapted to different geotechnical, hydrogeological, and environmental conditions in different cities and different construction methods has become a top priority. erefore, the research on the safety control index of underground engineering monitoring will be the key research direction [24].…”
Section: Layout Of Monitoring Points and Safety Control Standardsmentioning
confidence: 99%
“…For instance, in the case of the Alberg Tunnel in Austria, the allowable net displacement was specified as 10% of the tunnel radius or the length of the anchor, preferably not exceeding 30 cm. Tan et al [9] suggested that the maximum allowable displacement varied with burial depth and was approximately 1/1000 of the burial depth. Skempton and MacDonald [10] suggested limits on structural deformations based on studies of permissible structural deformations.…”
Section: Introductionmentioning
confidence: 99%