Discrete-Event Simulation and Optimization of Spare Parts Inventory and Preventive Maintenance Integration Model Considering Cooling Down and Machine Dismantling Time Factor

Abstract: The time for cooling down and dismantling happens very fast so that spare parts have to be already available prior to the shutdown to avoid excessive downtime due to spare parts unavailability. This condition is common for most engines including machines in manufacturing plants, airplanes engines, ship engines, automobile engines, or heavy equipment in mining. However, this condition does not apply for gas turbines. For gas turbines, cooling down and dismantling are taking a few days and even more than 1 week.… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(7 citation statements)
references
References 17 publications
0
5
0
Order By: Relevance
“…As a part of future work, we can use various optimization 29,30) and machine learning-based algorithms 31,32,33,34) to further improve the model performance.…”
Section: Discussionmentioning
confidence: 99%
“…As a part of future work, we can use various optimization 29,30) and machine learning-based algorithms 31,32,33,34) to further improve the model performance.…”
Section: Discussionmentioning
confidence: 99%
“…In this article, the system modeling is calculated numerically using a computer program. The research on simulation models conducted by most researchers and academicians uses many empirical models to verify theories and solve complex calculations 18,19) . The floating crane design used in the simulation model is a bargeshaped structure that can be called a floating crane barge.…”
Section: Model Descriptionmentioning
confidence: 99%
“…Simulation modeling assists in analyzing the manufacturing system in a better way [28][29][30][31][32] . Using ProModel ® software, the current study created a simulation model of ORR in a job shop with three setup times and shop utilization levels.…”
Section: Configuration Of Simulation Modelmentioning
confidence: 99%