Development of work breakdown structure standard for safety planning on stadium construction work based on risk

Abstract: Purpose: The purpose of this study is to reduce the level of work accidents in stadium construction by developing risk-based work breakdown structures. Methodology: The research methodology includes several stages, namely the literature study, analysis of data archives and previously related project and research, as well as through the validation of experts. Result: The results of this study are WBS standards, implementation methods, activities, resources, potential hazard risks and safety planning using risk-… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(5 citation statements)
references
References 8 publications
0
5
0
Order By: Relevance
“… WBS Level 5 : Activities Activities were more detailed descriptions from work packages at level 4 which contains steps to accomplished goal that can be monitored by project managers [11,12].…”
Section: Results Of Research Question 1: Wbs Standardsmentioning
confidence: 99%
See 1 more Smart Citation
“… WBS Level 5 : Activities Activities were more detailed descriptions from work packages at level 4 which contains steps to accomplished goal that can be monitored by project managers [11,12].…”
Section: Results Of Research Question 1: Wbs Standardsmentioning
confidence: 99%
“…It's not very necessary to present alternatives in WBS for ease of use on site. All types of design used in the project would mainly be listed in WBS Level 4. WBS Level 5 : Activities Activities were more detailed descriptions from work packages at level 4 which contains steps to accomplished goal that can be monitored by project managers[11,12].…”
mentioning
confidence: 99%
“…in May on the 14th and 19th days. there is a proportion of failures outside the LCL line on day 21, so it can be said that the process is still not under control [26].…”
Section: Discussionmentioning
confidence: 99%
“…Data processing is carried out in two stages. The first stage of data processing measures Quality Control, and the second stage is Risk Management [26]. 1.…”
Section: Data Processingmentioning
confidence: 99%
“…Previous research on WBS has been conducted for various structures such as buildings [8][9][10], stadiums [11][12], roads [13], bridges [14][15][16][17], railways [19], and seaports [20][21]. However, the developed WBS has focused on planning costs, quality, and construction safety, not time planning.…”
Section: Introductionmentioning
confidence: 99%