“…Non-value-added activities in construction are the gaps which can be noted in Figure 1. They are categorised as material delivery (transportation and handling); overhead cost reduction during construction; preliminary cost reduction; supply; variation management; plant and equipment hire (depreciation), and payment of sub-contractors (Yates, 2013;Jayamathan and Rameezdeen, 2014;Khanh and Kim, 2015;Yahya, Boussabaine and Alzaed, 2016). The waste category in this study can comprise both physical and non-physical wastes (Sandhu, 2014;Ajayi et al, 2016;Chatziaras, Psomopoulos and Themelis, 2016;Yahya, Boussabaine and Alzaed, 2016).…”