2017
DOI: 10.15587/1729-4061.2017.95914
|View full text |Cite
|
Sign up to set email alerts
|

Development of a verification method of estimated indicators for their use as an optimization criterion

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
20
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
6
2

Relationship

3
5

Authors

Journals

citations
Cited by 42 publications
(20 citation statements)
references
References 14 publications
(17 reference statements)
0
20
0
Order By: Relevance
“…There was some progress in this direction after creation of a cybernetic model of a technological operation [24]. The next step was to determine formal features of an effectiveness formula [25] and a series of studies aimed at verification of evaluation indicators corresponding to characteristics [26][27][28][29][30][31].…”
Section: Literature Review and Problem Statementmentioning
confidence: 99%
See 2 more Smart Citations
“…There was some progress in this direction after creation of a cybernetic model of a technological operation [24]. The next step was to determine formal features of an effectiveness formula [25] and a series of studies aimed at verification of evaluation indicators corresponding to characteristics [26][27][28][29][30][31].…”
Section: Literature Review and Problem Statementmentioning
confidence: 99%
“…There is a class of reference models of operations with predetermined efficiency defined based on the study of synch ronized models of operational processes in work [29]. And authors of work [30] determined limitations of the possibility to use direct methods for estimation of efficiency with a use of mathematical modeling techniques based on the results of the study.…”
Section: Fig 2 Transformation Of the Data Of The Cybernetic Operatimentioning
confidence: 99%
See 1 more Smart Citation
“…Studies have shown that the maximum of efficiency of the operational process is located to the right of the point of minimum cost [22].…”
Section: Pe Re Tp El Re Pe Tomentioning
confidence: 99%
“…The most urgent task of assessing the ES effectiveness operations [10] is raised in those cases where the cost issues [11], speed [12] and the time of production [13], within the material flows, were clearly linked with the need to take into account the nature of demand [14] and consequences of a possible shortage of products [15].…”
Section: Research Of Existing Solutions Of the Problemmentioning
confidence: 99%