Development of a simulation-based decision support system for controlling stochastic flexible job shop manufacturing systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
24
0
2

Year Published

2011
2011
2018
2018

Publication Types

Select...
5
5

Relationship

0
10

Authors

Journals

citations
Cited by 62 publications
(26 citation statements)
references
References 48 publications
0
24
0
2
Order By: Relevance
“…Mahdavi et al [39] developed a real-time simulation-based decision support system for production control of the stochastic FJSP under stochastic processing time of machines. Wang and Yu [40] proposed a beam search-based heuristic algorithm to tackle the FJSP with machine availability constraints due to maintenance activities.…”
Section: Related Literaturementioning
confidence: 99%
“…Mahdavi et al [39] developed a real-time simulation-based decision support system for production control of the stochastic FJSP under stochastic processing time of machines. Wang and Yu [40] proposed a beam search-based heuristic algorithm to tackle the FJSP with machine availability constraints due to maintenance activities.…”
Section: Related Literaturementioning
confidence: 99%
“…They evaluated their method based on an industrial case study. Mahdavi et al [35] development of a simulation-based decision support system for controlling stochastic flexible job shop manufacturing systems. Savory and Williams [36] describe a discreteevent simulation model of a U-shaped manufacturing cell and the integration of it with activity-based costing (ABC) concepts cost estimation and analysis of the manufacturing cell design.…”
Section: Background Of the Researchmentioning
confidence: 99%
“…Rajinder Singh Virk and Dr. Gurvinder Singh [23] have demonstrated that a key component of any Relational Distributed Database Query Optimizer was to fragment various tables and distribute fragmented Data over the sites of network. Then find a near optimal or best possible sub query operation allocation plan in a stipulated time period.…”
Section: Abbe Mowshowitz Et Almentioning
confidence: 99%