Development of a BIM-based production planning and control system for Lean Construction through advancement and integration of existing management techniques

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
20
0
1

Year Published

2021
2021
2024
2024

Publication Types

Select...
7
1
1

Relationship

2
7

Authors

Journals

citations
Cited by 24 publications
(21 citation statements)
references
References 19 publications
0
20
0
1
Order By: Relevance
“…king (the general contractor). The setting of DPK duration and estimated cost in addition to planned value distribution over subordinated DOK is also undertaken by last planners [59].…”
Section: Discussionmentioning
confidence: 99%
“…king (the general contractor). The setting of DPK duration and estimated cost in addition to planned value distribution over subordinated DOK is also undertaken by last planners [59].…”
Section: Discussionmentioning
confidence: 99%
“…Dave and Sacks (2020) described three case studies on the integration of BIM with LPS and demonstrated how software tools that incorporate BIM models with process flow functionality that are is based Lean principles can support more effective communication. Additionally, Schimanski et al (2020) proposed a new BIM-based production management system, which is characterized by a theoretical integration model for BIM and existing construction management techniques, and a methodology for applying these concepts in practice.…”
Section: Introductionmentioning
confidence: 99%
“…Evidently. integrating BIM models with production management systems can help streamline and standardize the production schedules with relevant building and the site information [ 17 ].…”
Section: Introductionmentioning
confidence: 99%