2011
DOI: 10.1016/j.jlp.2011.01.008
|View full text |Cite
|
Sign up to set email alerts
|

Development and application of equipment maintenance and safety integrity management system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
18
0

Year Published

2011
2011
2024
2024

Publication Types

Select...
7
2
1

Relationship

0
10

Authors

Journals

citations
Cited by 45 publications
(18 citation statements)
references
References 17 publications
0
18
0
Order By: Relevance
“…Safety indices may have other usages; they can be extended to represent the safety levels of instrument design or work conditions (Grattan and Nicholson, 2010). Proper design for safety indicators will help decision making to minimize operations risks (Qingfeng et al, 2011;Shu and Zhao, 2014). It also helps decision makers to enhance the organizational safety learning culture (Gerbec, 2013).…”
Section: Safety Criteriamentioning
confidence: 99%
“…Safety indices may have other usages; they can be extended to represent the safety levels of instrument design or work conditions (Grattan and Nicholson, 2010). Proper design for safety indicators will help decision making to minimize operations risks (Qingfeng et al, 2011;Shu and Zhao, 2014). It also helps decision makers to enhance the organizational safety learning culture (Gerbec, 2013).…”
Section: Safety Criteriamentioning
confidence: 99%
“…7 composed of platform senior leader, technical director, supervisor (Conchie et al, 2013), and site personnel (O'Dea and Flin, 2001) including maintenance personnel and operation personnel, maintaining a trained and competent work force with an awareness of equipment is an important issue for LE (Mearns and Flin, 1995;Qingfeng et al, 2011). A gap analysis was conducted by providing a check list for identifying obsolescence and organizational risk factors (Mearns and Flin, 1995;Vinnem et al, 2012), including deviation from new requirements, new needs, new technology, lack of spare parts, lack of space and lack of competence.…”
Section: Obsolescence and Organizational Challengesmentioning
confidence: 99%
“…Moreover, these modifications are occasionally a part of the production plant tasks, such as Corrective Maintenance (CM) or Preventive Maintenance (PM), which requires some changes to the system to carry out the maintenance tasks (Qingfeng, Wenbin, Xin, Jianfeng, & Qingbin, 2011). Another example of a modification which may need to be made is replacing plant equipment or devices which, in turn, make it necessary to modify the system according to the new device's specifications.…”
Section: Production Plant Business Rules Overviewmentioning
confidence: 99%