2011
DOI: 10.1016/j.eswa.2010.09.069
|View full text |Cite
|
Sign up to set email alerts
|

Developing strategic measurement and improvement for the biopharmaceutical firm: Using the BSC hierarchy

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
29
0
1

Year Published

2012
2012
2019
2019

Publication Types

Select...
10

Relationship

0
10

Authors

Journals

citations
Cited by 49 publications
(31 citation statements)
references
References 27 publications
0
29
0
1
Order By: Relevance
“…In this study, the authors take the advantages of both techniques to assess the performance of petroleum supply chain management. Likewise, Huang, Lai, and Lin (2011) proposed to facilitate performance measurement and strategic management in the pharmaceutical firm by utilizing the BSC-AHP hybrid technique. Furthermore, another study was performed by Chan (2009).…”
Section: Ahp Application Overviewmentioning
confidence: 99%
“…In this study, the authors take the advantages of both techniques to assess the performance of petroleum supply chain management. Likewise, Huang, Lai, and Lin (2011) proposed to facilitate performance measurement and strategic management in the pharmaceutical firm by utilizing the BSC-AHP hybrid technique. Furthermore, another study was performed by Chan (2009).…”
Section: Ahp Application Overviewmentioning
confidence: 99%
“…Huang et al (2009) designed a knowledge based system using BSC system. Huang et al (2011) developed strategic measurement and improvement for the biopharmaceutical firm based on the implementation of the BSC hierarchy. Lin and Wu (2008) proposed a causal analytical method for group decision-making under fuzzy environment.…”
Section: Environmentmentioning
confidence: 99%
“…In other words, by considering the strategy map as a basis and foundation for BSC, a pattern is produced where as its innovators declare leads in acceleration of successful implementation of BSC (Makhijani & Creelman, 2008). For example, there are many studies (Jassbi et al, 2011;Huang et al, 2011;Chang et al, 2011;Cebeci, 2009;Buytendijk et al, 2010;Tohidi et al, 2010a;Tohidi et al , 2010b), which accelerate the implementation of their scorecard by applying the strategy map.…”
Section: Introductionmentioning
confidence: 99%