Developing Crew Allocation System for the Precast Industry Using Genetic Algorithms

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
36
0

Year Published

2013
2013
2022
2022

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 50 publications
(36 citation statements)
references
References 36 publications
0
36
0
Order By: Relevance
“…Over the past decade, the Neural Networking (NN) has become one of the most popular optimization and event simulation methods in a number of engineering fields. In construction industry, it is mostly used for simulation of events and resources as an alternative or addition to the well-known Monte-Carlo simulation of events [30][31][32][33][34][35]. Hola and Schabowicz have made NN models for estimating the time and cost of serial operation of soil excavation machines.…”
Section: Optimization Methods For Final Selection Machinerymentioning
confidence: 99%
“…Over the past decade, the Neural Networking (NN) has become one of the most popular optimization and event simulation methods in a number of engineering fields. In construction industry, it is mostly used for simulation of events and resources as an alternative or addition to the well-known Monte-Carlo simulation of events [30][31][32][33][34][35]. Hola and Schabowicz have made NN models for estimating the time and cost of serial operation of soil excavation machines.…”
Section: Optimization Methods For Final Selection Machinerymentioning
confidence: 99%
“…Francis Siu et al (2015) proposed a crew-job allocation model to facilitate resource management for both project and workface levels. Al-Bazi and Dawood (2010) presented a strategy to allocate crews of workers in the precast concrete industry using genetic algorithms-based simulation modeling. This work was later extended (Al-Bazi and Dawood, 2017) in a model that optimizes costs of resources while considering different crew allocation constraints such as skills of workers, crew formation details and the parallel repetitive layout of manufacturing operations.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Adeli and Karim (1997) presented a general formulation for the sheduling of construction projects using a non-linear optimization approach providing the capabilities of the critical path method and linear scheduling methods for multiple construction applications. Al-Bazi and Dawood (2010) presented a strategy to allocate crews of workers in the precast concrete industry using genetic algorithms-based simulation modeling. Hegazy and Wassef (2001) developed a model for scheduling and cost optimization of repetitive construction projects by integrating the critical path and line of balance methods.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Several researchers have used discrete event simulation (DES) to develop such a technique for analyzing the effect of different resource allocations. Examples include evaluating the effect of different resource allocation on the concrete batching operations, [1], earthmoving operations [2], residential construction inspection process [3], precast concrete workshops [4], and tunnel planning [5].…”
Section: Introductionmentioning
confidence: 99%