Finding Optimum Resource Allocation to Optimizing Construction Project Time/Cost through Combination of Artificial Agents CPM and GA

Abstract: In order to plan a construction project, computer simulations are frequently used to predict the performance of the operations through simulating the process flows and resource selection procedure. However IntroductionDespite the fact that different robust methods have been developed for project scheduling and planning, in the construction industry, Critical Path Method (CPM) is still the most popular method. The first major cause of this popularity is the simplicity of the CPM. On the other hand, for finding… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 26 publications
0
2
0
Order By: Relevance
“…A project can be a unique service or product. In each project there are some constraints including but not limited to time, cost, and scope [2][3][4]. The project manager must balance between the mentioned constraints as each project has a different condition and different objectives [5,6].…”
Section: Introductionmentioning
confidence: 99%
“…A project can be a unique service or product. In each project there are some constraints including but not limited to time, cost, and scope [2][3][4]. The project manager must balance between the mentioned constraints as each project has a different condition and different objectives [5,6].…”
Section: Introductionmentioning
confidence: 99%
“…- lated to identification, cause-effect and their analysis (Choudhry et al, 2014;Shen et al, 2017;Xu et al, 2018); -Schedule optimization algorithms and models: A number of CPS optimization algorithms have been studied to solve multiple CPS problems, either single objective or multiple objectives, with single or multiple constraints such as genetic algorithm (Long & Ohsato, 2009;Zou et al, 2016), fuzzy stochastic network (Radziszewska-Zielina et al, 2017), Monte Caro simulation (Indhu & Farhan, 2015), fuzzy mathematical models (Castro-Lacouture et al, 2009), constraint programming, linear programming, and symbiotic organisms search (Cheng et al, 2016); -CPS emerging technologies: CPS emerging technologies have been examined in previous studies such as 4D-BIM (Mirzaei et al, 2018) to detect time-space problems, geographical information system (GIS) (Bansal & Pal, 2009) to identify logical error and missed activities, integration of BIM with primavera (Subramani & Ammai, 2018) to manage risks and BIM schedule (Chen et al, 2011;Ding et al, 2015) to assign crew and other resources; -Resource scheduling: One of the most research areas in CPS is to solve resource constrained scheduling problems (Christodoulou et al, 2012;Giran et al, 2017). It includes but not limited to, resource allocation (Khanzadi et al, 2016), resource levelling (El-Rayes & Jun, 2009), resource utilization (Siu et al, 2016); -Lean project scheduling: The application of lean principle (e.g. Last Planner System (LPS)) has been widely studied to improve performance of project scheduling.…”
Section: Science Mapping Of Co-occurrence Of Abstractmentioning
confidence: 99%