Developing a national programme of flood risk management measures: Moldova

Abstract: Abstract.A Technical Assistance project funded by the European Investment Bank has been undertaken to develop a programme of flood risk management measures for Moldova that will address the main shortcomings in the present flood management system, and provide the basis for long-term improvement. Areas of significant flood risk were identified using national hydraulic and flood risk modelling, and flood hazard and flood risk maps were then prepared for these high risk areas. The flood risk was calculated using … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…One is the ALOS-2/PALSAR-2 inundation image observed on July 30, 2015 provided by JAXA (see Table 1), which is used to evaluate the model results for the 2015 flood event. The other one is the 14-days composite MODIS flood inundation product (26 July to 8 Aug, 2016) provided by NASA (see Table 1)[32, 3436].…”
Section: Methodsmentioning
confidence: 99%
“…One is the ALOS-2/PALSAR-2 inundation image observed on July 30, 2015 provided by JAXA (see Table 1), which is used to evaluate the model results for the 2015 flood event. The other one is the 14-days composite MODIS flood inundation product (26 July to 8 Aug, 2016) provided by NASA (see Table 1)[32, 3436].…”
Section: Methodsmentioning
confidence: 99%