2012
DOI: 10.1109/tste.2011.2163092
|View full text |Cite
|
Sign up to set email alerts
|

Determination of Short-Term Power Dispatch Schedule for a Wind Farm Incorporated With Dual-Battery Energy Storage Scheme

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
5

Citation Types

0
98
0
1

Year Published

2013
2013
2016
2016

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 136 publications
(99 citation statements)
references
References 24 publications
0
98
0
1
Order By: Relevance
“…With the above considerations in mind, a dual battery energy storage system (BESS) scheme to alleviate the impacts of wind generation on grid systems has been proposed in [3]. The scheme involves the application of two identical BESS modules, denoted as BESS Module 1 and BESS Module 2 in Fig.…”
Section: Introductionmentioning
confidence: 99%
See 4 more Smart Citations
“…With the above considerations in mind, a dual battery energy storage system (BESS) scheme to alleviate the impacts of wind generation on grid systems has been proposed in [3]. The scheme involves the application of two identical BESS modules, denoted as BESS Module 1 and BESS Module 2 in Fig.…”
Section: Introductionmentioning
confidence: 99%
“…Comparison of the dual-BESS scheme with other schemes shown in the literature has been included in [3]. The proposed scheme is to participate in power market operation and is based on the assumption that deep-cycle batteries have been used.…”
Section: Introductionmentioning
confidence: 99%
See 3 more Smart Citations