Designing project schedule using crashing method to compress the fiber to the home project schedule

Abstract: ABC Company is an agent of network construction, operation, and maintenance. ABC Company is currently implementing the STTF (Shit to the Front) project, which is the project to add FTTH (Fiber to the Home) networks in areas that can have high customer demand. One of the STTF project construction sites is the Indra Prahasta II housing location. However, the project is currently experiencing work delays due to the Covid-19 disaster in Indonesia. Delays in project execution can result in potential prospects choos… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…The crashing method is used to optimise working time by shortening the duration of work at the lowest additional cost (Anugerah et al, 2021). Activities in a project can be accelerated in various ways, namely increasing labour, increasing work time, changing work methods, or using construction tools that help accelerate the project.…”
Section: Critical Path Methods (Cpm) and Crashing Methodsmentioning
confidence: 99%
“…The crashing method is used to optimise working time by shortening the duration of work at the lowest additional cost (Anugerah et al, 2021). Activities in a project can be accelerated in various ways, namely increasing labour, increasing work time, changing work methods, or using construction tools that help accelerate the project.…”
Section: Critical Path Methods (Cpm) and Crashing Methodsmentioning
confidence: 99%
“…A critical path is a series of activities that are on the longest route of a network diagram and have minimal slack and float values. Slack and float are the amount of time delay activity (allowance time) without delaying or interfering with the completion of the entire project [8]. Critical Path Method (CPM) is a project management model that makes cost the object of analysis.…”
Section: Critical Path Methods (Cpm)mentioning
confidence: 99%
“…Several previous studies are used as references in this study consisting of: 1. Designing project schedule using crashing method to compress the fiber to the home project schedule [8] One of the STTF project building locales is the Indra Prahasta II lodging area. The project delays because of the Covid-19 calamity in Indonesia.…”
Section: Research Comparisons From Different Viewpointsmentioning
confidence: 99%