2019
DOI: 10.4236/jpee.2019.79004
|View full text |Cite
|
Sign up to set email alerts
|

Design of Circular Arc Blade Hydrokinetic Turbine—A Case of Rural Electrification in Zambia

Abstract: The rate of electrification in rural areas in Zambia is very low, currently standing at less than 5% despite having abundant flowing water resources. Hydrokinetic technology is an alternative among other promising technologies for rural area electrification because of availability of abundant flowing Rivers and low population in rural settlement. In this paper, the author designed and numerically simulated a circular arc blade hydrokinetic turbine system. The design power for the horizontal axis hydrokinetic t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…The rural electrification rate in Zambia is significantly below ten per cent. Although specific energy access data is currently lacking according to the Rural Electrification Authority' (REA), this rate is well below the average rural electrification rate in SSA, which is estimated at around 22.59% [59,60].…”
Section: Country Context: Energy Access and Governance In Zambiamentioning
confidence: 99%
“…The rural electrification rate in Zambia is significantly below ten per cent. Although specific energy access data is currently lacking according to the Rural Electrification Authority' (REA), this rate is well below the average rural electrification rate in SSA, which is estimated at around 22.59% [59,60].…”
Section: Country Context: Energy Access and Governance In Zambiamentioning
confidence: 99%