2018 Condition Monitoring and Diagnosis (CMD) 2018
DOI: 10.1109/cmd.2018.8535801
|View full text |Cite
|
Sign up to set email alerts
|

Design of an omnidirectional PD UHF antenna for substation inspection robot considering installation circumstance

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…Ltd., Shenyang Institute of Automation, Chinese Academy of Sciences, Chongqing University and Beijing Electric Power Company. The substation inspection robot developed by Shenyang Institute of Automation, Chinese Academy of Sciences can carry out substation inspection in snow and ice [6]; in 2012, the substation inspection robot jointly developed by Chongqing University and Chongqing Electric Power Company was put into operation in 220kV Dashi intelligent substation, and this robot can work in substations with steps [7]; in 2014, the trackless robot launched by Zhejiang Guozhi Robot Technology Co. In 2015, the substation inspection robot designed and developed under the auspices of State Grid Beijing Electric Power Branch was put into operation in Zhichunli 220 kV substation, and then gradually put into use in more than twenty 220 kV substations in Beijing.…”
Section: Domestic Development Statusmentioning
confidence: 99%
“…Ltd., Shenyang Institute of Automation, Chinese Academy of Sciences, Chongqing University and Beijing Electric Power Company. The substation inspection robot developed by Shenyang Institute of Automation, Chinese Academy of Sciences can carry out substation inspection in snow and ice [6]; in 2012, the substation inspection robot jointly developed by Chongqing University and Chongqing Electric Power Company was put into operation in 220kV Dashi intelligent substation, and this robot can work in substations with steps [7]; in 2014, the trackless robot launched by Zhejiang Guozhi Robot Technology Co. In 2015, the substation inspection robot designed and developed under the auspices of State Grid Beijing Electric Power Branch was put into operation in Zhichunli 220 kV substation, and then gradually put into use in more than twenty 220 kV substations in Beijing.…”
Section: Domestic Development Statusmentioning
confidence: 99%
“…Moreover, there is some literature regarding conducting simulation [42] or experiment [16] based on an air-filled tank model with results considerably different when compared to analysis on an oil-immersed transformer. Characteristics of the induced EM wave propagation have been analyzed by several researchers using CST Microwave Studio for simulation [10,47,87] and in operating power transformers in field study [88,89]. Furthermore, there is an increasing number of researchers conducting simulation by means of the FDTD method to analyze the characteristics of the PD induced EM wave: frequency response analysis of the UHF sensor design [90,91,92] and characteristics of EM wave propagation [42,48,82,93].…”
Section: Effect On Uhf Signal Propagation In a Power Transformermentioning
confidence: 99%
“…However, these techniques are more likely to be susceptible to the surrounding interference in signal transmission and propagation at the local substation. Moreover, in [ 47 ], a moving robot equipped an antenna with omni-directional directivity was proposed for substation inspection. This can provide a higher level of automation in equipment maintenance.…”
Section: Uhf Sensors In Partial Discharge Detectionmentioning
confidence: 99%