2017
DOI: 10.1088/0256-307x/34/1/012902
|View full text |Cite|
|
Sign up to set email alerts
|

Design Consideration of 650-MHz Circular Electron–Positron Collider Klystron and Simulation of Its Beam Tester

Abstract: We present the first phase R&D for the 800 kW cw, 650 MHz klystron for the future circular electron–positron collider (CEPC) project in China. The CEPC requires 192 klystrons and it is desired to be designed in the Institute of High Energy Physics, CAS, and manufactured domestically. Therefore, we present the manufacturing schedule of this project; the three-stage development from the beam test tube to the klystron having a high efficiency structure. Design of the beam test tube that comprises electron gun and… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2018
2018
2022
2022

Publication Types

Select...
2

Relationship

1
1

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 4 publications
0
2
0
Order By: Relevance
“…The design of gun and collector is presented in the reference. [9] In this paper, the detailed design of RF section and high-power test results of this klystron are presented.…”
Section: Introductionmentioning
confidence: 99%
“…The design of gun and collector is presented in the reference. [9] In this paper, the detailed design of RF section and high-power test results of this klystron are presented.…”
Section: Introductionmentioning
confidence: 99%
“…1. [3] Now we changed to start from Fig. 1(b) to manufacture and test the klystron designed by classical approach.…”
Section: Introductionmentioning
confidence: 99%