2012
DOI: 10.13182/fst61-301
|View full text |Cite
|
Sign up to set email alerts
|

Design and Test of the Fast Ferrite Tuner for ICRF Heating in EAST

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
5
0

Year Published

2014
2014
2021
2021

Publication Types

Select...
6
1

Relationship

1
6

Authors

Journals

citations
Cited by 11 publications
(5 citation statements)
references
References 15 publications
0
5
0
Order By: Relevance
“…In order to achieve better real-time impedance matching, the integral design goal of the FT magnetic circuit is that the DC bias magnetic field is 2000 Gs and alternating magnetic field is ±400 Gs. With the aim of designing an effective magnetic circuit, the two identical E-type cores were adopted referenced to the design schemes of the magnetic circuit [17], so that the closed magnetic core was composed by relative openings of the core.…”
Section: Biasing Magnet Designmentioning
confidence: 99%
See 2 more Smart Citations
“…In order to achieve better real-time impedance matching, the integral design goal of the FT magnetic circuit is that the DC bias magnetic field is 2000 Gs and alternating magnetic field is ±400 Gs. With the aim of designing an effective magnetic circuit, the two identical E-type cores were adopted referenced to the design schemes of the magnetic circuit [17], so that the closed magnetic core was composed by relative openings of the core.…”
Section: Biasing Magnet Designmentioning
confidence: 99%
“…However, the traditional algorithm is no longer appropriate. In order to confirm the size parameter and excitation coil and provide the significant reference for the design scheme, the finite element method has been adopted to simulate the FT magnetic circuit [17].…”
Section: Simulation For Biasing Magnetic Circuit Optimizationmentioning
confidence: 99%
See 1 more Smart Citation
“…To isolate the HF generators from the reflected power, at JET [5] and ASDEX Upgrade [6], a system using 3 dB hybrid couplers was successfully used. Many tokamak teams have studied and implemented matching systems that can be used in real time, including the internal conjugate-T system of impedance matching at WEST [7] and for ITER-like antenna at JET [5], the external conjugate-T impdance-matching system at JET [8,9], the liquid dielectric stubs at EAST [10] and LHD [11], and the TOKAMAKS ferrite tuners at Alcator C-Mod [12,13], EAST [14], and KSTAR [15].…”
Section: Introductionmentioning
confidence: 99%
“…As a result, if plasma loading changes rapidly or varies in a large range, the transmitter would be mismatched. Many groups have studied and implemented matching systems that can be used in real-time, including frequency modulation on JET [1], dielectric liquid stubs on EAST [2] and LHD [3], ferrite tuners on Alcator C-Mod [4], EAST [5] and KSTAR [6]. In this paper, we report the recent progress on the implementation and performance of real time fast matching system using ferrite tuners on the Alcator C-Mod tokamak.…”
Section: Introductionmentioning
confidence: 99%