2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century 2008
DOI: 10.1109/pes.2008.4596544
|View full text |Cite
|
Sign up to set email alerts
|

Design and realisation of a unique MV converter implemented in a new power electronic equipment test laboratory for emerging MV applications

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2009
2009
2021
2021

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…In response to particularly these developments, KEMA is operating the Flex Power Grid Laboratory (FPGLab, Figure 5). The FPGLab [11], [12] offers unique services for validating grid inverters and its control system by offering a predefined and programmable grid in the medium-voltage range under complex, realistic conditions in terms of voltage level (400V-24kV), power level (1MVA), fundamental frequency range (DC-75Hz) and harmonic frequency range (2400Hz bandwidth).…”
Section: Advanced Emulation and Hardware-in-the-loop Techniquesmentioning
confidence: 99%
“…In response to particularly these developments, KEMA is operating the Flex Power Grid Laboratory (FPGLab, Figure 5). The FPGLab [11], [12] offers unique services for validating grid inverters and its control system by offering a predefined and programmable grid in the medium-voltage range under complex, realistic conditions in terms of voltage level (400V-24kV), power level (1MVA), fundamental frequency range (DC-75Hz) and harmonic frequency range (2400Hz bandwidth).…”
Section: Advanced Emulation and Hardware-in-the-loop Techniquesmentioning
confidence: 99%
“…The operational tests will be performed in the Flex Power Grid Lab [6], a medium-voltage power electronic laboratory situated in Arnhem (NL). The objective of the tests is to ensure that the Smart MV/LV-station complies with the specified requirements as set out in the project scope.…”
Section: Operational Tests In Fpglabmentioning
confidence: 99%