2021 IEEE Power &Amp; Energy Society General Meeting (PESGM) 2021
DOI: 10.1109/pesgm46819.2021.9638242
|View full text |Cite
|
Sign up to set email alerts
|

Design and Implementation of a low-cost PMU: validation by tests and performance during 2019 Argentinean blackout

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 4 publications
0
1
0
Order By: Relevance
“…The intelligent ICT has undoubtedly enhanced the control and operational efficiency of the NPS, but it has also concurrently increased the risk of fault propagation across domains [4][5][6]. Recently, several large-scale blackouts have occurred worldwide, including the blackout in Brazil in 2018, the blackout in Argentina in 2019, and the blackout in Pakistan in 2023 [7][8][9]. While the initial causes of each accident vary, research shows that the fundamental cause of most cascading failures is the tripping of specific transmission lines due to natural or human factors.…”
Section: Introductionmentioning
confidence: 99%
“…The intelligent ICT has undoubtedly enhanced the control and operational efficiency of the NPS, but it has also concurrently increased the risk of fault propagation across domains [4][5][6]. Recently, several large-scale blackouts have occurred worldwide, including the blackout in Brazil in 2018, the blackout in Argentina in 2019, and the blackout in Pakistan in 2023 [7][8][9]. While the initial causes of each accident vary, research shows that the fundamental cause of most cascading failures is the tripping of specific transmission lines due to natural or human factors.…”
Section: Introductionmentioning
confidence: 99%
“…The control of voltage vectors is a new concept in differential protections [62], the use of which was previously impossible due to the principle of the summation of current vectors used in differential protections. In case of damage in the protection operation zone, a difference in modulus and angle appears between the voltage vectors at the ends of the reactivated cable line, which additionally allows for the source of the damage to be fixed and the sensitivity of differential protection to be increased, as shown in Figure 3.…”
mentioning
confidence: 99%