2020 IEEE/IAS Industrial and Commercial Power System Asia (I&CPS Asia) 2020
DOI: 10.1109/icpsasia48933.2020.9208563
|View full text |Cite
|
Sign up to set email alerts
|

Design and Application of Regional Multi-energy Complementary Distributed Energy Management and Control Platform Based on Big Data

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 2 publications
0
2
0
Order By: Relevance
“…In order to manage such an heterogeneous and heavy data payload, an industrial device/router, often called Smart Logger, must be installed in the PV plant in order to collect data from sources 1 to 3 (wireless sensor data, local weather data, and other connected devices data) and send them to the cloud IoT-SCADA through a 4G mobile network to be fused with web data and blockchain-processed [43][44][45]. In this respect, the best possible solution seems, at present, to be an industrial device/router equipped with Ru-tOS, a Linux-based operating system, targeting embedded devices.…”
Section: Network Communication Protocolsmentioning
confidence: 99%
“…In order to manage such an heterogeneous and heavy data payload, an industrial device/router, often called Smart Logger, must be installed in the PV plant in order to collect data from sources 1 to 3 (wireless sensor data, local weather data, and other connected devices data) and send them to the cloud IoT-SCADA through a 4G mobile network to be fused with web data and blockchain-processed [43][44][45]. In this respect, the best possible solution seems, at present, to be an industrial device/router equipped with Ru-tOS, a Linux-based operating system, targeting embedded devices.…”
Section: Network Communication Protocolsmentioning
confidence: 99%
“…This personnel will also help to solve the problems that may arise in the projects in a timely and correct manner [38]. This issue should be considered in the personnel recruitment process [39]. Additionally, development training should be provided to the personnel working within the companies.…”
Section: Literature On Distributed Energy Investmentsmentioning
confidence: 99%