2019
DOI: 10.35940/ijrte.b1277.0782s319
|View full text |Cite
|
Sign up to set email alerts
|

Design Analysis of Web-Based Furniture Marketing Information System

Abstract: In the industrial world and with the progress of the times, technology will greatly help a small industry in managing beneficial information for consumers. Not all wood furniture industries have stores. However, the majority of shop owners in Pringsewu do not produce their own furniture. The owners who do not produce their own furniture receive merchandise from entrepreneurs who do not have shops. The owners provide furniture model orders needed by customers and users. In this case study, the data had been com… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2019
2019
2021
2021

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…In an SDLC cycle, there are six stages performed by researchers in developing and designing the system 1. Create running workflow analysis [66][67][68][69][70] Reseachers applied the SDLC cycle writer sequentially, started from the first stage to the sixth stage. Every step that has finished then reviewed, sometimes with an expert user, especially in the requirements specification and system design stages to ensure that the stages have been done correctly and as expected.…”
Section: Methodsmentioning
confidence: 99%
“…In an SDLC cycle, there are six stages performed by researchers in developing and designing the system 1. Create running workflow analysis [66][67][68][69][70] Reseachers applied the SDLC cycle writer sequentially, started from the first stage to the sixth stage. Every step that has finished then reviewed, sometimes with an expert user, especially in the requirements specification and system design stages to ensure that the stages have been done correctly and as expected.…”
Section: Methodsmentioning
confidence: 99%
“…Since then, it is sufficient documents to claim the volume at the payment phase of the project. In fact, this process of document collection causes many difficulties for contractors who seek to explain the scope of variation because the ability to store information is often limited and errors are frequent due to a large amount of information (Ayshwarya et al, 2019;Suyatno et al, 2019;Wiendara et al, 2019). Moreover, it is also due to the many departments that must handle the implementation process for carrying out the variation.…”
Section: Variation Valuementioning
confidence: 99%