2022
DOI: 10.3390/su141811767
|View full text |Cite
|
Sign up to set email alerts
|

Defining a Digital Strategy in a BIM Environment to Manage Existing Reinforced Concrete Bridges in the Context of Italian Regulation

Abstract: Regulatory activity concerning the management of existing bridges has recently been affected by updates, for instance, in Italy, which calls for a speedy and pragmatic approach based on new technologies such as building information modeling (BIM), when dealing with the survey and risk classification as well as the evaluation and monitoring of structural safety. This paper focuses on the development and integration of a digital solution, based principally on the specific framework developed by the authors, whic… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
3
0
2

Year Published

2023
2023
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(5 citation statements)
references
References 75 publications
0
3
0
2
Order By: Relevance
“…The bridge-inspection process is a crucial task that aims to ensure the bridge's safety and identify maintenance needs. In practice, O&M data are collected through paper-based reports; even if they are digitized, the available information remains fragmented for stakeholders who gather various types of O&M data [21,22]. Written inspection reports pose several obstacles, including difficulties in sharing information, loss or confusion, and communication errors with different projectinvolved domains.…”
Section: Literature Reviewmentioning
confidence: 99%
“…The bridge-inspection process is a crucial task that aims to ensure the bridge's safety and identify maintenance needs. In practice, O&M data are collected through paper-based reports; even if they are digitized, the available information remains fragmented for stakeholders who gather various types of O&M data [21,22]. Written inspection reports pose several obstacles, including difficulties in sharing information, loss or confusion, and communication errors with different projectinvolved domains.…”
Section: Literature Reviewmentioning
confidence: 99%
“…En la literatura se pudo ver que los principales beneficios de BIM son la mejora de la comunicación multimodal mientras se mantiene la comunicación sincrónica durante la fase de construcción (Al-Ashmori et al 2020). Por otro lado, BIM crea desarrollos Aunque, acorde a (Ciccone et al, 2022) hasta la fecha, la aplicación de metodologías BIM ha involucrado mayormente el contexto de nuevos proyectos; esta se puede aplicar a cada fase del ciclo de vida de los activos, incluidas las fases de gestión.…”
Section: Development Of Communication Protocols Between Bim Elements ...unclassified
“…Las metodologías BIM también pueden ser asistidas e integradas con otras tecnologías. Por ejemplo, se podría considerar la tecnología Internet de las cosas (IOT) para respaldar evaluaciones estructurales inteligentes y desarrollar una gestión "inteligente" del ciclo de vida de una obra, también combinada con otros medios como IFC (Ciccone et al, 2022). Asimismo, en el estudio de (Cheng et al, 2022) se indicó y comprobó que BIM podía trabajar colaborativamente con otros entornos para derivar en un producto más completo.…”
Section: Development Of Communication Protocols Between Bim Elements ...unclassified
“…One important aspect is the incorporation of building information modeling (BIM) with geographic information systems (GIS) to improve the effectiveness of building management systems (BMS). This combination promotes a comprehensive approach by integrating geographical data, geographic mapping, and information management, thus enhancing the effectiveness and knowledge of bridge management strategies [2,3,14,16,[19][20][21][22][23][24][25][26][27][28][29]. Moreover, some studies have investigated the application of building information modeling (BIM) in the field of risk management for bridge construction.…”
Section: Introductionmentioning
confidence: 99%
“…Salzano et al (2022) [59],Wang et al (2022) [60],Lu & Brilakis (2019) [74],Mohammadi et al (2023) [57],Akula et al (2013) [77],Ciccone et al (2021) [27],Scianna et al (2022) [62],Kaewunruen et al (2020) [8],Kaewunruen et al (2023) [63],Bono et al. (2021) [70], Jiang et al (2022) [65], Previtali et al (2022) [68], Liu et al (2018) [75] Efficient allocation and utilization of resources Zhang et al (2023) [9], Ariza-López et al (2022) [61], Moon et al (2013) [78], Lu & Brilakis (2019) [74], Akula et al (2013) [77], Ciccone et al (2021) [27], Scianna et al (2022) [62], Kaewunruen et al (2021) [72], Celik et al (2023 [58]), Sabah Jarallah & Mahjoob (2022) [66], Liu et al (2018) [75] Improving design practices through providing designers with accurate information Van Eldik et al (2020) [71], Moon et al (2013) [78], Scianna et al (2022) [62], Kaewunruen et al (2020) [8], Kaewunruen et al (2023) [63] Celik et al (2022) [64], Sabah Jarallah & Mahjoob (2022) [66], Ershadi et al (2022) [67], Liu et al (2018) [75] Effective communication among stakeholders in the project and the capacity to exchange information with dependability and clarity Zhang et al (2023) [9], Lu & Brilakis (2019) [74], Kaewunruen et al (2020) [8], Kaewunruen et al (2021) [72], Kaewunruen et al (2023) [63], Celik et al (2022) [64], Celik et al (2023) [58], Previtali et al (2022) [68], Bui (2020) [73], Liu et al (2018) [75] Precise planning of costs and schedules for the project to prevent any claims and delays and achieve the required level of quality Zhang et al (2023) [9], Ariza-López et al (2022) [61], Kang et al (2016) [76], Moon et al (2013) [78], Lu & Brilakis (2019) [74], Mohammadi et al (2023) [57], Akula et al (2013) [77], Ciccone et al (2021) [27], Scianna et al (2022) [62], Kaewunruen et al (2021) [72], Kaewunruen et al (2020) [8], Celik et al (2022) [64], Sabah Jarallah & Mahjoob (2022) [66], Previtali et al (2022) [68], Ershadi et al (2022 [67]), Bui (2020) [73], Marzouk & Hisham (2014) [21], Liu et al (2018) [75] Enabling real-time tracking and monitoring to guarantee the precision of the execution and handle any recently arising modifications Wang et al (2022) [60], Kang et al (2016) [76], Akula et al (2013) [77], Hamdan et al (2021) [69], Scianna et al (2022) [62], Kaewunruen et al (2020) [8], Celik et al (2022) [64], Celik et al (2023) [58], Previtali et al (2022) [68] Increasing the possibility of avoiding clashes and reworks during different phases of the bridge's lifespan Kang et al (2016) [76], Lu & Brilakis (2019) [74], Hamdan et al (2021) [69], Jiang et al (2022) [65], Bui (2020) [73], Liu et al (2018) [75] Raising productivity and meticulous organization of the required work teams Kaewunruen et al (2020) [8], Celik et al (2022) [64], Celik et al (2023) [58], Bono et al (2021) [70], Ershadi et al (2022)[67],Marzouk & Hisham (2014) …”
mentioning
confidence: 99%