2019 International Conference on Industrial Engineering and Systems Management (IESM) 2019
DOI: 10.1109/iesm45758.2019.8948198
|View full text |Cite
|
Sign up to set email alerts
|

Decoupled Lead Time in finite capacity flowshop: a feedback loop approach

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
12
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
3

Relationship

1
7

Authors

Journals

citations
Cited by 14 publications
(12 citation statements)
references
References 20 publications
0
12
0
Order By: Relevance
“…The performance of the method can vary accordingly. However, a flow shop configuration seems to be the only one that was studied (Miclo et al, 2015;2016a;2016b;Miclo et al, 2019;Dessevre, Martin, Baptiste, Lamothe, Pellerin & Lauras, 2019).…”
Section: Results Of Component 2: the Implementation Of The Ddmrp Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The performance of the method can vary accordingly. However, a flow shop configuration seems to be the only one that was studied (Miclo et al, 2015;2016a;2016b;Miclo et al, 2019;Dessevre, Martin, Baptiste, Lamothe, Pellerin & Lauras, 2019).…”
Section: Results Of Component 2: the Implementation Of The Ddmrp Methodsmentioning
confidence: 99%
“…These tools are distinguished among the simple ones dealing with simulations based on Excel (Ihme & Stratton, 2015;Shofa & Widyarto, 2017;Pekarčíková et al, 2019), SQL (Ihme & Stratton, 2015) and R+ . Or the studies requiring more complex modeling approaches like Discrete Event Simulation (Dessevre, Martin, Baptiste, Lamothe, Pellerin & Lauras, 2019;Kortabarria & Elizburu, 2018;Miclo et al, 2015;2016a;2016b;Miclo et al, 2019;Shofa et al, 2018;Velasco-Acosta et al, 2019), Genetic algorithms (Jiang & Rim, 2016;Rim, Jiang & Lee, 2014), a rulebased approach (Martin et al, 2019;Lee & Rim 2019) or surveys (Martin et al, 2018b).…”
Section: Results Of Component 2: the Implementation Of The Ddmrp Methodsmentioning
confidence: 99%
“…To report these advantages, those authors use theoretical calculations and simulations of discrete events as well as real data from various companies. Related to the implementation process, another article proposes a dynamic adjustment of the decoupled lead time, taking into account lead time variability (Dessevre et al, 2019). Two of the studies analyse the changes implemented and the qualitative and quantitative results obtained by several companies following their conversion from traditional or classical models to the DDMRP model (Bahu et al, 2019;Kortabarria et al, 2018).…”
Section: Research Area Representative Articles Resultsmentioning
confidence: 99%
“…The defined safety stock formula eliminates subjectivity when calculating the safety stock of DDMRP. (Dessevre et al, 2019) This article defines a dynamic adjustment of the decoupled lead time, taking into account lead time variability. The results show that the dynamic adjustment of buffer sizes reduces stock while ensuring a good quality of service.…”
Section: Research Area Representative Articles Resultsmentioning
confidence: 99%
“…Additionally, changing a parameter value upstream in the buffer network may have unforeseen consequences downstream. The original authors of the DDMRP (Ptak & Smith, 2016), as well as some authors in more recent works (Dessevre et al, 2019;Lee & Rim, 2019), have recommended some rules to update these parameters. In this paper, we will refer to these rules as "policies".…”
Section: Introductionmentioning
confidence: 99%