Second International Conference on Systems (ICONS'07) 2007
DOI: 10.1109/icons.2007.18
|View full text |Cite
|
Sign up to set email alerts
|

Dealing with execution-overruns to improve the temporal robustness of real-time systems scheduled FP and EDF

Abstract: International audienc

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
6
0

Year Published

2010
2010
2022
2022

Publication Types

Select...
3
3
1

Relationship

2
5

Authors

Journals

citations
Cited by 13 publications
(6 citation statements)
references
References 11 publications
0
6
0
Order By: Relevance
“…EDF-Allowance is a EDF [18] scheduling approach which can tolerate up to 𝑘 execution time budget overruns within a sliding time window 𝑊 without deadline violations [15]. Similar to our EDF-IVD-SE, EDF-Allowance leverages static slack to account for overruns.…”
Section: B Edf-allowancementioning
confidence: 99%
See 1 more Smart Citation
“…EDF-Allowance is a EDF [18] scheduling approach which can tolerate up to 𝑘 execution time budget overruns within a sliding time window 𝑊 without deadline violations [15]. Similar to our EDF-IVD-SE, EDF-Allowance leverages static slack to account for overruns.…”
Section: B Edf-allowancementioning
confidence: 99%
“…Moreover, the lack of resources in deeply embedded systems rules out dynamic slack monitoring approaches [13] , or to precompute proper schedules for all scenarios at design time [14]. Therefore, approaches which emphasize static design time decisions over elaborate dynamic decisions during system operation are preferable, but verification-friendly state-of-the-art approaches, which resort to static slack analysis during design time [15], [16] , suffer from low acceptance rates. Hence, there is a strong need for a mixed-criticality approach for industrial fault-tolerant systems which provides degraded service to low criticality tasks, is sensible for verification, and likely finds a solution for highly loaded systems.…”
Section: Introductionmentioning
confidence: 99%
“…One of the available approach to compute the allowance of the execution duration has been proposed by Bougueroua et al [11]. For a given value of allowance A j i , this method consists in checking that the system remains schedulable when the execution duration of a task τ i is equal to…”
Section: Allowance Computed From Wcrtmentioning
confidence: 99%
“…Some models allow to take into account this kind of problem. For example, Bougueroua, in Bougueroua et al (2007), introduced the notion of allowance to achieve this aim.…”
Section: Introductionmentioning
confidence: 99%