Cyber-Physical Co-Simulation of Shipboard Integrated Power System Based on Optimized Event-Driven Synchronization

Abstract: As the energy management system (EMS) participates in the closed-loop control of shipboard integrated power system (IPS), the information network of EMS is closely coupled with the power system and its characteristics affect power system performance significantly. To study the close-coupling relationship between the two systems, a cyber–physical co-simulation platform based on the high level architecture (HLA) framework is constructed in this paper. The proposed platform uses PSCAD and OPNET to simulate shipbo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
9
0

Year Published

2021
2021
2022
2022

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 9 publications
(9 citation statements)
references
References 23 publications
(25 reference statements)
0
9
0
Order By: Relevance
“…These test results are shown in Figure 8, using a logarithmic scale for all the axes. As it can be observed in Figure 8a, the number of synchronizations can be controlled by the icountMax and Th parameters, as indicated by Equation (2). It can be seen that the number of synchronizations shoots up exponentially as Th t and icountMax parameters are diminished.…”
mentioning
confidence: 77%
See 2 more Smart Citations
“…These test results are shown in Figure 8, using a logarithmic scale for all the axes. As it can be observed in Figure 8a, the number of synchronizations can be controlled by the icountMax and Th parameters, as indicated by Equation (2). It can be seen that the number of synchronizations shoots up exponentially as Th t and icountMax parameters are diminished.…”
mentioning
confidence: 77%
“…To reduce this difficulty, virtual platforms are presented as a perfect solution for evaluating whole systems and analyzing hardware/software proposals before their implementation stage. These virtual platforms use hardware/software co-simulation techniques profusely described in the literature [2][3][4]. In those, the software and hardware designs are combined at different levels of abstraction and with different timing accuracy.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…represents the set of nodes at the physical layer that can be detected by the scheduling center and meets the following requirements: (3)(4)(5)(6)(7)(8)(9)(10)(11)(12)(13) According to the information received, the dispatching center takes the minimum load loss as the objective function to carry out an optimization calculation and defines SC(P The dispatching center updates the electrical parameters to the working nodes of the communication layer along with the control instruction. A control information transmission failure occurs when the transmission delay is greater than the threshold MaxT , and the node receiving the control information adjusts the electrical properties according to P j∼ 12 .…”
Section: ) Physical Layer Failure Analysismentioning
confidence: 99%
“…[3][4][5][6][7][8][9][10][11] υ 1 is the set of nodes on the physical layer coupled to the communication layer's new failure nodes. N p is the working subset of the physical layer, and B ρυ 1 (ρυ 1 ,…”
mentioning
confidence: 99%