2011
DOI: 10.3182/20110828-6-it-1002.00170
|View full text |Cite
|
Sign up to set email alerts
|

Crane Scheduling of Steel-making and Continuous Casting Process Using the Mixed-Timed Petri Net Modelling Via CPLEX Optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2013
2013
2023
2023

Publication Types

Select...
5
1
1

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(3 citation statements)
references
References 6 publications
0
3
0
Order By: Relevance
“…Moreover, [6] proposes a specific PN system of iron and steel process, to analyze the performances of the iron and steel process. However, the paper [5] analyzes the performances of a specific resource of the SM-CC process and lacks generality. Moreover, the model presented in [6] is hard to describe and to apply to real systems.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Moreover, [6] proposes a specific PN system of iron and steel process, to analyze the performances of the iron and steel process. However, the paper [5] analyzes the performances of a specific resource of the SM-CC process and lacks generality. Moreover, the model presented in [6] is hard to describe and to apply to real systems.…”
Section: Introductionmentioning
confidence: 99%
“…Sun et al [5] propose a mixed TPN model in order to improve the performances of the crane scheduling problem. Moreover, [6] proposes a specific PN system of iron and steel process, to analyze the performances of the iron and steel process.…”
Section: Introductionmentioning
confidence: 99%
“…It is also important to properly select the model solution parameters. For example, Sun et al [14] use CPLEX a branch-and-cut method in their work for optimization of firing transition sequences, based on the Mixed-timed Petri net [15]. In our realizations, we used the CPLEX optimization package (see Section 6).…”
Section: Introductionmentioning
confidence: 99%