2016
DOI: 10.1016/j.habitatint.2016.08.002
|View full text |Cite
|
Sign up to set email alerts
|

Cost analysis for sustainable off-site construction based on a multiple-case study in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

3
131
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 174 publications
(134 citation statements)
references
References 21 publications
3
131
0
Order By: Relevance
“…The 10 most important factors were "Specification and standards for prefabricated building design", "Related experience of manager", "Rationality of PC split", "Capacity of production line in PC", "Operant level on installation personnel", "Order quantity of PC", "Coordination between designer and PC manufacturer", "Collaborative capacity among professional designers", "Coordination of connection nodes of PC components", and "Related experience of designer". "Specification and standards for prefabricated building design" were the most important factors among the 49 factors, which was consistent with the actuality in China [7]. "Design standardization" was the primary task for promoting the prefabrication.…”
Section: Research Findingssupporting
confidence: 70%
See 4 more Smart Citations
“…The 10 most important factors were "Specification and standards for prefabricated building design", "Related experience of manager", "Rationality of PC split", "Capacity of production line in PC", "Operant level on installation personnel", "Order quantity of PC", "Coordination between designer and PC manufacturer", "Collaborative capacity among professional designers", "Coordination of connection nodes of PC components", and "Related experience of designer". "Specification and standards for prefabricated building design" were the most important factors among the 49 factors, which was consistent with the actuality in China [7]. "Design standardization" was the primary task for promoting the prefabrication.…”
Section: Research Findingssupporting
confidence: 70%
“…Each interview lasted between 30 min and 1.5 h. All interviews were conducted between October 2016 and November 2016. The results showed that PC, as the basic element of prefabrication, played an important role in cost management [7]. Moreover, coordination among the stakeholders also had a significant effect on cost management in the whole construction process [54].…”
Section: Factors Affecting the Capital Cost Of Prefabricationmentioning
confidence: 97%
See 3 more Smart Citations