Abstract: Abstract:As a sustainable construction method, prefabrication has become popular in many nations. However, there are many challenges for prefabrication, especially in terms of cost. Previous studies have revealed that higher capital cost was the most important barrier to the implementation of prefabrication. Thus, the objective of this study is to explore and evaluate the critical factors affecting the capital cost of prefabrication and examine how cost management may be affected by the "experience", "corporat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

3
48
0
1

Year Published

2018
2018
2022
2022

Publication Types

Select...
6

Relationship

1
5

Authors

Journals

citations
Cited by 52 publications
(52 citation statements)
references
References 64 publications
3
48
0
1
Order By: Relevance
“…As for machines, the larger lifting weight of tower crane on-site was usually acquired by the larger dimensions of PC, thus resulting in high mechanical cost [11]. Moreover, the special construction technology was added to prefabrication, such as steam curing and storage of PC, which increased the production cost of PC [29]. The deepening design cost was also increased in the prefabrication method due to the separation between the design and production processes.…”
Section: Cost Incrementsmentioning
confidence: 99%
See 4 more Smart Citations
“…As for machines, the larger lifting weight of tower crane on-site was usually acquired by the larger dimensions of PC, thus resulting in high mechanical cost [11]. Moreover, the special construction technology was added to prefabrication, such as steam curing and storage of PC, which increased the production cost of PC [29]. The deepening design cost was also increased in the prefabrication method due to the separation between the design and production processes.…”
Section: Cost Incrementsmentioning
confidence: 99%
“…Design diversity, aesthetics, maintenance complexity and quality impression also affect the initial cost [12,29,30]. Meanwhile, supply chain issues and lack of codes and standards contributed to high cost [10,12,29]. Chua et al revealed the cost of mold usage and replacement had an impact on prefabrication cost [31].…”
Section: Cost Incrementsmentioning
confidence: 99%