2016
DOI: 10.1016/j.apenergy.2016.07.117
|View full text |Cite
|
Sign up to set email alerts
|

Corrective economic dispatch and operational cycles for probabilistic unit commitment with demand response and high wind power

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
19
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
5
3

Relationship

1
7

Authors

Journals

citations
Cited by 57 publications
(19 citation statements)
references
References 57 publications
0
19
0
Order By: Relevance
“…3 | BASELINE CYCLES OPTIMIZED BY JAYA ALGORITHM Jaya algorithm, as an evolutionary swarm optimization algorithm, was firstly proposed in a published paper by Annual interest rate (i) 10% (Rezayan and Behbahaninia, 36 Fazelpour and Morosuk, 40 Rao 42 in 2016 and has been employed in various kinds of studies especially including the ones related with energy and thermal engineering. [43][44][45] This optimization algorithm is advantageous for the simple solution modification principle of being close to the best solution and away from the worst one as formulated by Equation 13.…”
Section: Economic Analysismentioning
confidence: 99%
“…3 | BASELINE CYCLES OPTIMIZED BY JAYA ALGORITHM Jaya algorithm, as an evolutionary swarm optimization algorithm, was firstly proposed in a published paper by Annual interest rate (i) 10% (Rezayan and Behbahaninia, 36 Fazelpour and Morosuk, 40 Rao 42 in 2016 and has been employed in various kinds of studies especially including the ones related with energy and thermal engineering. [43][44][45] This optimization algorithm is advantageous for the simple solution modification principle of being close to the best solution and away from the worst one as formulated by Equation 13.…”
Section: Economic Analysismentioning
confidence: 99%
“…The probabilistic power system adequacy assessment is gaining more attention with the growth of renewable generation. Various adequacy assessment studies that take into account renewable power have been presented in the last few years [7][8][9][10][11][12][13]. Most of these studies consider random events either by imposing an upper bound to reliability indices determining the loss of load or loss of energy expectation, or by adding a financial penalty into the cost function.…”
Section: Introductionmentioning
confidence: 99%
“…The acceptable bounds for TUs' power generations considering the up/down ramp rates are updated in the re-dispatching process of RD on the committed TUs. Accordingly, relations (17) to (19) ensure that correction of generation levels of committed TUs at hour t cannot affect the ramp rate constraints at the previous hour t-1. The prohibited operating zones strictly pose the restrictions for TUs to participate in load demand regulations.…”
Section: Proposed Handling Of the Up/down Ramping Rate Limitmentioning
confidence: 99%
“…The variables in the first group are the essential RCUC's variables that affect the convergence speed and global search potential of the introduced NSBSO algorithm. The reader is referred to [19] for more details on the challenges caused by binary variables in optimization problems. To deal with these issues, a new concept of operating or commitment cycles is introduced in this study to convert the binary variables to integer ones with extended range of variation.…”
Section: B Developed Redefining Of On/off Variablesmentioning
confidence: 99%